The sculpture facilities at the Fine Arts Building (FAB) consists of a wood shop, metal fabrication, plaster room, and an alternative media/installation room equipped with a video projector.

The wood shop is equipped with a SawStop table saw, compound miter saw, band saws, 12 inch jointer and planer combo, drill presses, belt sander, oscillating spindle sander, two disc sanders, edge sander, wood and steel grinders, router table, planer, sandblaster, a panel saw and a fork lift. The metal fabrication area is equipped with 2 Mig welders, plasma cutter, chop saw, cold saw, metal grinders, stick welder, and oxy-acetylene stations. Metal shaping equipment includes a
50 inch slip roll, tube bender, two brakes, and a foot shear.